A provider’s proposal can show what it intends to deliver; its references help establish what it has delivered under real operating conditions. Before signing, procurement teams should speak directly with customers whose projects resemble their own, check the supplier’s actual role, and compare what those customers say with the evidence available. A positive reference is useful, but its value depends on how closely the project, contract scope, and operating environment match the purchase being considered.
For railway control equipment or maritime technology, the distinction can be consequential. A supplier may have contributed a component to a successful project without having been responsible for system integration, safety approval, or long-term support. Reference checks should establish those boundaries before the customer’s experience is used to justify a contract award.
Ask the provider for several customer references covering work similar to the proposed purchase. Request enough information to assess each project before arranging a call: the customer organization, location, delivery period, supplied scope, project status, and a contact who can discuss the work. Explain which aspects of your requirement matter most so the supplier can identify relevant contacts.
Similarity should be judged by the risks in your contract, not simply by the customer’s name or the size of the project. A signaling supplier’s reference may be relevant because it involved an upgrade on an operating railway, interfaces with existing equipment, and a constrained commissioning window. A vessel technology reference may be relevant because the equipment had to integrate with shipboard systems and receive support across multiple ports.
Consider these factors when choosing whom to contact:
A recently completed installation can help assess delivery and commissioning, while a longer-running installation can provide more useful information about maintenance and recurring faults. Neither answers every question. Where possible, include both perspectives and record the limits of each.
Also check whether the reference reflects the solution and team being offered now. A provider may cite a project completed by a predecessor company, another business unit, or a subcontractor. That experience may still be relevant, but ask who performed the work and whether the proposed delivery organization retains the necessary capability.

Start with material the customer or project owner has made public, such as a project announcement, operator report, or shipyard release. These sources may establish that a project exists and identify some participants. They rarely prove that a particular supplier delivered the full scope described in a proposal, or that the equipment met its contractual performance requirements.
Then ask the provider for evidence proportionate to the purchase and the confidentiality restrictions involved. Depending on the project, that could include a redacted acceptance record, a completion certificate identifying the supplied scope, a service agreement, or documentation showing the relevant equipment and its operational status. Check dates, entity names, project descriptions, and responsibilities against the reference contact’s account.
For safety-related or regulated equipment, separate project experience from evidence of compliance. A customer’s satisfaction with an interlocking system, braking component, or maritime subsystem does not by itself establish that the proposed configuration meets your requirements. Ask for the applicable approvals, assessments, test records, or certificates identified in your procurement specifications, and check their scope, validity, and relationship to the exact product and configuration offered.
Where a supplier cannot share a document, ask whether a redacted version, a customer-authorized confirmation, or a discussion with an appropriate technical representative is possible. Confidentiality is a legitimate constraint; it does not eliminate the need for enough evidence to support a purchasing decision. If the gap remains, record what could not be established and decide whether another form of assurance is available before award.
Arrange the call with the reference contact’s consent and, where practical, without the supplier present. Confirm the contact’s role and involvement first: a procurement manager may be able to explain commercial performance, while an engineering or operations representative may be better placed to discuss commissioning, faults, and maintenance. One person may not have visibility across the whole contract.
Send a short description of your intended scope in advance, without disclosing sensitive procurement information. Then ask for examples and timelines rather than an overall rating. Useful questions include:
Follow up on vague answers. If a contact says support was “good,” ask what happened when an issue was escalated, who had authority to act, and whether the agreed response and resolution expectations were met. If a project was delayed, distinguish a supplier-controlled delivery failure from a delay caused by site access, another contractor, or changes requested by the customer.
A constructive reference need not describe a flawless project. Complex installations can encounter interface problems and changes in scope. The more useful evidence is whether responsibilities were clear, issues were documented, corrective actions were effective, and the customer could obtain decisions when needed.
For a railway component, ask whether the reference covers only factory delivery or also installation, integration, testing, and service on the network. A pantograph reference, for example, is more informative when the operating conditions and vehicle interfaces resemble your application. For a braking system, establish whether the contact can discuss the supplied component alone or the performance of the integrated system.
For maritime equipment, establish whether the reference relates to a vessel in service, a shipyard installation, or a design-stage order. Ask how the provider coordinated with the yard, vessel operator, and other equipment suppliers, and what support was available after handover. For an LNG carrier project, a reference for one subsystem should not be treated as evidence of responsibility for the vessel’s entire containment or propulsion arrangement.
These distinctions also apply to subcontractors. If a specialist will perform commissioning or provide field service, ask who has used that specialist and how the prime contractor managed its performance. A strong reference for the prime supplier’s hardware may leave a significant gap if the proposed contract depends on a different service organization.
Document each check in a form the evaluation team can compare: the reference project, contact’s role, scope and operating conditions, evidence reviewed, positive findings, concerns, and any material differences from the proposed purchase. Separate facts supported by documents or direct discussion from claims that remain uncorroborated.
Look for patterns, but do not count references as interchangeable votes. Two enthusiastic contacts from projects with limited integration demands may tell you less about a complex retrofit than one detailed account from a comparable operating site. Equally, a single negative account deserves context: ask what happened, whether the issue was within the provider’s control, and what evidence supports the explanation.
Pay particular attention when the provider changes its description of its role, offers only contacts who cannot discuss delivery, or resists reasonable attempts to verify project scope. A reference that is limited by confidentiality is different from an account that conflicts with available records. Give the provider an opportunity to explain discrepancies and supply relevant evidence, then assess any remaining uncertainty against the consequences of failure.
The findings should affect the contract where appropriate. If references reveal slow issue escalation, define response obligations, escalation contacts, and reporting requirements. If integration responsibilities were unclear, specify interface ownership and acceptance responsibilities. If customers struggled to obtain documentation or spares, make their delivery and availability explicit in the agreement. Technical, legal, and operational teams should review these provisions together with procurement.
Where a material claim cannot be supported before signature, decide whether the purchase can proceed with a specific contractual obligation, an independently verified milestone, or another suitable safeguard. If the missing evidence concerns a requirement that must be established before award, resolve it before committing. The purpose of the reference check is to leave the buyer with a clear view of what has been demonstrated, what remains uncertain, and who will carry each responsibility after the contract is signed.