Size a reliquefaction unit against the highest credible net boil-off gas load that must be returned to the cargo tanks, not the average boil-off rate alone. On an LNG carrier, the limiting condition may be a low-speed passage or anchorage period: heat continues entering the tanks while propulsion gas demand falls. Insufficient capacity then reduces the vessel’s ability to control cargo pressure without using another approved gas-management route.

The selection therefore needs two linked calculations: a scenario-based gas balance and a process-performance assessment at the corresponding gas composition, suction conditions, cooling-water temperature, and electrical availability. Excess nameplate capacity is not automatically safer; it can increase generator loading and leave the plant operating inefficiently below its stable turndown limit.

Define what the installation must actually accomplish

First establish whether the vessel requires full reliquefaction capability, partial recovery alongside fuel consumption, or recovery only during selected operating modes. These objectives produce different capacities even for the same cargo containment system.

For full recovery, the design basis may require handling natural boil-off without relying on propulsion demand. For partial recovery, engine consumption can reduce the required load, but only where that consumption remains available in the governing scenario. A sea-going fuel demand cannot be credited during a berth stay simply because it appears in the vessel’s annual operating average.

Set the performance boundary before asking suppliers for quotations. “Capacity” might mean compressor inlet flow, gross condensed flow, or net liquid retained in the tanks. These are not interchangeable when the process includes flash gas, recycle, or a nitrogen-rich reject stream. For cargo recovery, net return is the useful metric, while suction handling capacity remains an essential equipment limit.

Build an operating envelope before calculating capacity

Use the vessel’s intended service profile to assemble a small number of governing cases. Each case should have its own cargo inventory, composition, tank pressure, heat ingress, gas consumers, and available utilities. Avoid combining unrelated maxima into an artificial condition, but do not omit combinations that can genuinely occur together.

Operating case Potential sizing constraint Evidence needed
Laden passage at normal service speed Balance between natural boil-off and engine consumption Heat-ingress basis and fuel-demand map at actual operating loads
Slow steaming or anchorage High surplus gas with reduced propulsion demand Minimum dependable gas consumption and expected duration
Warm seawater operation Reduced refrigeration capacity and increased power demand Supplier performance at specified seawater inlet conditions
Ballast voyage with heel Different vapor conditions, spray operation, and low-load stability Heel-management plan and tank thermal model
Restart after a plant trip Accumulated pressure and temporary recovery duty Restart sequence, pressure headroom, and recovery target
Loading or cooldown, if included Short-duration vapor generation beyond ordinary voyage duty Terminal vapor-return arrangements and vessel operating procedures

Loading and cooldown duties should not silently enter the continuous sizing basis. Some are managed through terminal vapor return or other dedicated arrangements. State explicitly which transients the reliquefaction plant must handle and which are outside its contractual scope.

Convert boil-off assumptions into a defensible mass rate

Obtain the containment-system heat-ingress or boil-off guarantee and check its reference conditions. Confirm whether the stated boil-off rate is based on initial loaded cargo, a defined reference inventory, or another contractual basis. Also check the assumed ambient conditions, cargo properties, and tank pressure.

For a mass-based boil-off rate expressed as a percentage per day:

BOG generation, kg/h = reference LNG mass, kg × BOR, %/day ÷ 100 ÷ 24

Where the starting point is cargo volume, convert it using the density associated with the specified LNG composition and condition. Do not substitute tank geometric capacity for actual loaded volume. Nor should a guaranteed daily rate automatically be multiplied by the declining cargo inventory: heat ingress does not necessarily decline in proportion to cargo mass.

A separate heat-leak calculation provides a useful cross-check. At a simplified steady saturated condition, evaporation is approximately heat input divided by the relevant latent heat. A voyage model should go further when pressure accumulation, liquid warming, stratification, or changing composition materially affects vapor generation.

Calculate the gas surplus without counting streams twice

For each operating case, prepare a mass balance around the cargo vapor system:

Net gas requiring treatment = natural BOG + other vapor entering the system − dependable fuel-gas consumption − other credited gas outlets

Only credit outlets that are available, acceptable, and intended for that condition. If routine gas combustion is excluded by the operating objective, it should not reduce the normal recovery duty. Emergency pressure protection remains a separate safety function, not spare process capacity.

Engine fuel demand must be expressed on a consistent mass basis. Where consumption is derived from energy demand, use the heating value of the relevant gas composition and account for the engine’s permitted gas-operating range. Minimum load, fuel switching, and equipment unavailability can all reduce the demand that is safe to credit.

Next expand the balance to include the selected process. Pressure reduction of condensed LNG may generate flash gas that returns to the suction system. This increases gross compressor and refrigeration throughput relative to net cargo recovery. Resolve that recycle through the process model rather than adding an arbitrary flash allowance to a supplier rating that already includes it.

How to size a reliquefaction unit for LNG carrier boil-off gas

Nitrogen introduces another distinction. Tank vapor composition may differ substantially from bulk liquid composition, and a nitrogen-rich stream can alter condensation behavior, compressor loading, and reject-gas requirements. Request a component balance showing what returns as liquid, what recycles, and what leaves the recovery boundary. A high inlet-flow rating does not by itself establish high LNG recovery.

Translate the mass balance into refrigeration and electrical duty

The same mass flow can impose different duties depending on inlet temperature, pressure, composition, and required return state. A simplified process-boundary relationship is:

Heat removed = sum of inlet mass-flow × enthalpy terms − sum of outlet mass-flow × enthalpy terms + net work input within the boundary

For an initial estimate, gas flow multiplied by the inlet-to-return enthalpy difference can indicate the scale of cooling required. It is not a substitute for a cycle calculation: compression, intercooling, heat recovery, flash separation, and refrigerant circulation determine where heat is removed and how much electrical power is needed.

Specify the battery limits used in every comparison. One supplier’s quoted power may include refrigeration compressors but exclude BOG compression, cooling-water pumps, lubrication systems, or other auxiliaries. Another may quote the complete package. Compare total installed-system demand at the same operating point.

  • BOG inlet: composition range, pressure, temperature, and allowable variation.
  • Liquid return: pressure, temperature or enthalpy, and expected flash behavior at tank entry.
  • Cooling utilities: seawater temperature, flow, fouling basis, and allowable pressure drop.
  • Electrical supply: continuous power availability, starting demand, and competing ship-service loads.
  • Recovery performance: net retained liquid and the quantity and composition of any reject stream.

Compare refrigeration cycles against these boundaries rather than selecting by cycle name. Nitrogen-based and mixed-refrigerant arrangements, for example, have different operating and maintenance implications, but suitability depends on their demonstrated capacity maps, utility needs, and vessel integration—not a generic efficiency ranking.

Apply margins to identified uncertainties

Keep the calculated operating load separate from the procurement margin. Otherwise, conservatism in the boil-off assumption, another allowance in the gas balance, and a supplier’s own design reserve can accumulate without a clear purpose.

Allocate allowances to specific uncertainties: containment heat ingress, cargo-property variation, model accuracy, equipment deterioration, or required recovery after an interruption. Then ask whether those uncertainties can occur together. A transparent margin register is more useful than one unexplained percentage applied to every parameter.

Capacity should be guaranteed at the limiting credible condition, not merely at a convenient reference point. Warm cooling water can raise power demand while reducing available throughput. An installed motor with spare rating does not prove the refrigeration train can deliver additional net recovery.

Check pressure recovery and minimum load as separate requirements

Continuous balance is only part of pressure management. During a shutdown, vapor and energy accumulate in the cargo system. After restart, a plant sized exactly to ongoing generation may arrest further accumulation but provide little recovery capability.

Use a dynamic tank model to establish permissible interruption duration and the extra duty needed to regain the target operating pressure. Tank vapor-space volume alone is insufficient: liquid thermal capacity, vapor-liquid equilibrium, changing vapor temperature, and cargo mixing also influence pressure response.

At the opposite end, verify minimum stable throughput. Request operating maps showing anti-surge recycle, refrigeration control limits, start-stop restrictions, and power demand at low load. A large single train may have acceptable peak capacity yet perform poorly during long periods of low surplus gas.

Choose redundancy around the required degraded mode

Redundancy should follow the vessel’s operating obligation after a failure. Define whether losing one train must preserve full recovery, permit reduced recovery with fuel consumption, or allow a limited period of pressure accumulation before another approved measure is needed.

For each proposed arrangement, calculate the shortfall with the relevant equipment unavailable. Compare that shortfall with validated pressure headroom and repair or restart time. Two trains do not provide meaningful independence if both depend on one vulnerable cooling-water supply, electrical feeder, control function, or shared compressor.

Multiple trains may improve turndown and maintenance flexibility, but they also add valves, auxiliaries, footprint, and control complexity. The selection should show which operating cases remain covered after a failure rather than relying on an unqualified redundancy label.

Turn the calculation into a comparable supplier guarantee

Issue a common case sheet to every bidder. Require guaranteed net recovery, suction throughput, total power, utility demand, and operating limits for the same gas and environmental conditions. Separate guaranteed values from predictions, and identify any cases that require interpolation or remain outside the tested performance envelope.

  1. Fix the recovery definition. State whether the guarantee is gross condensate or liquid retained after return flashing.
  2. Specify composition limits. Include credible vapor composition changes and the treatment of nitrogen-rich gas.
  3. Require a performance map. Cover peak duty, warm-water operation, minimum stable load, and expected normal operation.
  4. Define transient obligations. Include restart time, pressure-recovery capability, and response to loss of a gas consumer.
  5. Agree verification methods. Establish measurement boundaries, uncertainty treatment, acceptance tolerances, and correction methods for test conditions.

Close the evaluation with an integrated cargo-system review covering compressor suction behavior, liquid return, tank-pressure control, electrical load shedding, and approved fallback arrangements. Applicable flag, class, and containment-system requirements must be confirmed for the vessel; normal reliquefaction capacity must not be treated as a replacement for required independent pressure protection.

The final selection record should identify the governing case, required net recovery, associated gross process flow, guaranteed power, minimum stable capacity, and performance with equipment unavailable. If a proposal meets peak throughput only by assuming gas consumption or electrical capacity that the vessel cannot depend on, it has not met the sizing requirement.